Integrated Maintenance
Excel-Based Maintenance Management Suite — PRO

Professional Maintenance
Systems Built for Real Operations.

Professional maintenance planning, scheduling, reliability, inventory, and asset management tools designed for industrial maintenance teams. No CMMS subscription. Download, open, and run.

Browse Products Visit Gumroad Store →
100%
Excel-Based
No Subscriptions
Instant
Download &
Deploy Same Day
Field-Tested
By Maintenance
Professionals
7 Tools
PRO Suite
+ 2 Bundles
Available Now

Professional Maintenance Toolkit

Seven professional-grade Excel systems, organized by function — each built around a real maintenance workflow and ready to download and put to work today.

Choose by Problem

Which Tool Fits Your Operation?

Start with the maintenance problem you are trying to control. Each workbook is built around a real planning, scheduling, reliability, or storeroom workflow.

PMs, backlog, work orders
Maintenance Tracker PRO

Best starting point if you need one structured place to track preventive maintenance, corrective work, due dates, priority, status, and compliance.

View Tracker
Crew loading and coverage
Technician Scheduler PRO

Use this when the daily problem is technician availability, leave, shift coverage, skill matching, and balancing assigned work across the team.

View Scheduler
Shift handover issues
Daily Shift Log PRO

Built for handover notes, open issues, downtime events, escalations, and follow-up actions that need to survive from one shift to the next.

View Shift Log
Stockouts and critical spares
Spare Parts Tracker PRO

Choose this when you need control of min/max levels, reorder points, suppliers, lead times, critical spares, and parts usage history.

View Parts Tracker
Downtime and management KPIs
Maintenance KPI Dashboard PRO

Use this when leadership needs PM compliance, MTBF, MTTR, downtime hours, downtime cost, and reliability trends without rebuilding charts.

View KPI Dashboard
Shutdown or outage planning
Shutdown Planner PRO

Made for major maintenance events where tasks, owners, dates, crews, priorities, and completion status need to stay visible from planning to closeout.

View Shutdown Planner
Who This Is For

Built For the People
Running Maintenance

If you manage maintenance — at any scale, in any industry — these tools were built with your daily reality in mind.

Maintenance Planners

Stop managing work orders in scattered spreadsheets. Get structured PM schedules, task registers, and shutdown plans that actually hold up under pressure.

Maintenance Supervisors

Keep your crew organized, shifts handed over cleanly, and open issues visible. Run the floor with tools that give you a clear picture at a glance.

Reliability Engineers

Track MTTR, MTBF, PM compliance, and downtime trends without building dashboards from scratch. Data-driven reporting that's ready on day one.

Facilities Managers

Manage assets, track condition, plan capital replacements, and keep maintenance records organized — across any type of facility or property portfolio.

Small Operations Without CMMS

Not ready for a $500/month CMMS? These tools give you 80% of the functionality for a one-time cost — no vendor lock-in, no learning curve, no IT setup.

Manufacturing Maintenance Teams

Production-critical environments need structured maintenance. Whether you're running food processing, heavy equipment, or industrial plant — these tools are built for that world.

Best Value

Bundle & Save

Get multiple tools at once and save significantly versus buying individually.

Before You Buy

Built to Open, Edit, and Use

These are practical Excel workbooks for teams that need structure quickly without waiting for a CMMS rollout, IT project, or long implementation cycle.

Editable Excel Files

Adjust lists, columns, priorities, areas, crews, equipment names, and maintenance categories to match your operation.

Instant Download

Buy through Gumroad, download the workbook, open it in Excel, and start building your maintenance records the same day.

No Subscription

One-time pricing for teams that need better maintenance control without a monthly CMMS license or vendor lock-in.

Maintenance Workflow First

The structure follows real planning, scheduling, asset, inventory, reliability, shutdown, and handover workflows.

Meet the Creator

Built From the Inside Out

Maintenance Professional

Hi, I'm Tony — a Maintenance Management Professional with 14+ years of hands-on experience, working today in public transit operations in Canada.

I created these templates after over a decade of managing maintenance schedules, shutdowns, work orders, spare parts, and workforce planning on the floor. That experience spans a wide range of industries — latex processing, heavy equipment maintenance, ice cream and dairy processing plants, vegan food production, aviation ground support equipment, and public transit fleet maintenance. Every one of those environments had its own challenges, but the same core problem: keeping maintenance organized without expensive software.

These aren't tools designed by a software company that's never seen a machine room. They're the same systems and processes used daily in real maintenance environments — structured in Excel so any team can open them, adapt them, and run them the same day.

No $500/month CMMS license. No six-week implementation. No IT department required. Just practical tools that actually work.

Latex Processing Heavy Equipment Ice Cream Plants Dairy Processing Vegan Food Plants Aviation GSE Transit Maintenance
14+
Years in maintenance & reliability
7
Industries worked across
7
PRO tools built & released
Canada
Based & building

I built these because every tool I found was either too expensive, too complex, or designed by people who'd never actually worked a maintenance shift. These templates solve the real problems — the ones you deal with every day.

Integrated Maintenance
Maintenance Management Professional · 14+ Years Experience · Canada
How It All Connects

A Mini-CMMS Ecosystem

Each tool works standalone — but together they form a complete maintenance management system without the software price tag.

Technician Scheduler
Plan your crew
→
Maintenance Tracker
Manage work orders
→
Spare Parts Tracker
Control your storeroom
→
KPI Dashboard
Track performance
→
Asset Lifecycle Tracker
Plan for the future

Five live tools already form a connected loop — from scheduling crews to tracking assets through their entire lifecycle. Add the Shutdown Planner and Daily Shift Log and you've got full operational coverage.

Next Chapter — In Development

The Spreadsheets Were
Just Phase One.

Every tool in this suite was built to solve a real problem on the floor — and now they're coming together into something bigger. The Integrated Maintenance System is a connected maintenance management app, built from the same field-tested logic as the PRO toolkit, designed for teams who've outgrown spreadsheets but don't want the cost or complexity of enterprise CMMS software.

Status: In Development — bookmark this page, the next update lands here first.
Available Now vs Coming Next

Templates Today. CMMS App Next.

The Excel toolkit is ready to use now. The Integrated Maintenance CMMS app is the next step for teams that want the same workflows connected in one system.

Available now
Excel Maintenance Toolkit

Downloadable workbooks for planning, scheduling, PM tracking, shutdowns, shift handover, parts, assets, and KPI reporting.

Coming next
Integrated Maintenance CMMS App

A connected maintenance management system based on the same field-tested workflows, designed for teams ready to move beyond spreadsheets.

Questions?

Need Help Choosing
the Right Template?

Not sure which tool fits your operation, or have a question before you buy? Reach out directly — happy to help you pick the right fit.

integratedmaintenance2@outlook.com
Ready to Get
Organized?

Download any tool instantly — no subscription, no sign-up. Just open Excel and go.